2012년 5월 23일 수요일

get ready to deck on(nearly)

We almost get ready to deck on the hull.

There was a little buble on the coving but was not a major because it is already strong enough. If we want to get rid of the bubble, we can make a small hole on it and fill it with glue anyway.


Flange is well done.


This is what I have to do today. I have to get the prow tube in exact position and cove.


It hardly can be seen in this picture but Lance grounded the foam out to prevent delaminating. We are going to get the centre case through this hole and fill the gap.


Cut the hatch with using jigsaw.


To let the deck go through this centre case jig, he is cutting the angled tip.


He put masking tape all the way around the hatch. I should have aske him why.


We have to adjust the height rightly or 1mm lower rather than 0.1mm higher because of the glue thickness.


It looks strong.


Dryfitting. It take quite a bit time to fit them in right position but it worth the fitting. Deck is going onto this.


It became way thicker than before because of the 5 layers of carbon fibre so I had to make the hole bigger rather being sloppy. The hole on the bulkhead was a bit off to starboard so I had to sand the port side to get the tube in centre. Take the measurement from the loftint, get this in right position.

He is making pattern to cut the transom.


Nice cutting. I can see the line up between frame and hull.


The height of transom is 145(143?) but it will not immerse into water deeply.


They sand the bottom of the girder to get the right height but end up using jigsaw to do faster.

Firstly, I get the right position of front part of the tube and fix it. Later, I made gunsight to get it going on the centre line.


The girder has to be 2.5mm lower because of the 1mm thickness of glue and the measurement from the centre case line, which we figured out with using the offcut putting on the girder.


Get the right position, put some foam wedges into the gap, cut them and cove. I should have cut the foam neatly and sanded before putting the tube through.

Cove with using rubberised epoxy. Hull stern is done.


Good.


Transom has been cut as well. It looks very swift. That residual edge will be cut out later on, which is hugely enough at the moment.


View from the centre of the girder at transom.


Coving is done. It was pretty hard to cove underside of the tube at the nose cone. I couldn't see my hand. It needs another piece of EDB on it anyway, which is what I have to do.


The gap between those two components is filled with 403 adhesive.

weave
tint
segment(black line...)
tickle
sloppy
laid off
over the hill
shiver
undi

prow tube

We carried on preparing turn over the hull.

This is the vacuming experiment the day before with this piece of foam. That white part there was a piece of peel ply with some slurry below that. Vacuming was OK but vac tape went through the peel ply, which is not bad. We can use this method next time.

We peeled all stacks off except peel ply. Well done.

From stern


The prow tube which I work on. One layer of 0/90 orientation of carbou double bias is laminated so far.


This is the peel ply I used yesterday which is available for cutting another carbon double bias 45/45 orientation.


I prepared every material, three pieces of carbon uni, carbou double bias and peel ply.


Lance transferred the centre case hole from lofting to a piece of vacume bag to cut out the centre case hole on the deck.

Like this picture.


We flew hot water through a tube having been in fridger all day long yesterday to release. Halve it and put it through the hole on the edge of flange and the bottom is going to be blocked with a piece of glass plate.


It is cut with an angle at the end.


Bore the centre case hole on the cockpit sole.

Nice job.


Get the right height with using scribers. Prior to using them make sure the bulkhead is plum, flat in a right position.


Cutting the line scribed with using jigsaw


Masking tape and cardboard on the deck for doing the flange going on the bulkhead


My job is done. It was a bit tricky to handle the 45/45 orientation carbon double bias because it really was easy to be stretched in 0/90 direction which is I had to get this around the tube but OK anyway.

Extra flange going into the prow. One small piece of EDB in the centre, One tape of EDB on it along the corner and anothe piece for whole area.


Nice job on wet coving. Laminating EDB is not really hard but the peel ply is nasty.


Every coving without tape or glass is done with rubberised epoxy.


Cut the bottom of the bulkhead following the shape of floor onto it.


Coving with using west system resin and laminating. Good.


Cover the stanchion with peel ply.

concave
inherent
reliance
realistic

mountain range
chippy
residual
havoc


2012년 5월 21일 월요일

Fore deck laminating

We laminated underside of the fore deck and coved centre case partly.

Rudder plates got position in their place.

Flanges are looking good. The peel ply was between the glass at each corner on the bulkhead so we had to cut out a bit.


Sanding the gantry tubes.

We had already got ready to vacume last week and vacumed today. We ran out of normal vacume bag so this time we used high temerature one. It is green, thicker and less elastic than normal one. We thought that we were going to put 2 pieces together fore aft but decided to make them across with 4 pieces of 2*4 each. One thing we had to think is the lap of each piece needs to be flat in order to put them easily to the vac tape having already on the deck, or think which way to go when unrolling the bag.


getting there


The jig we made before

offcuts. I presumed it would be long enough but we had to cover the deck to the 4th piece.

vacume on


nice

We had to adjust those heights and shape of the bulkhead but it looks almost done.

I reckon those corners would rather closed.

Using wedges, Lance and Andrew got the centrecase positioned but they are not enough to get it right. Centre case has to be accurately positioned.

We did the first stage of laminating the prow tube with one layer of carbon double bias with peel ply on it.


Setting into right position. Centre line, height and incline needs to be as perfect as.it can be

Stood a piece of wood on transom frame, using another piece to grab it quite strongly, Lance and Anrew used string to get the exact position of the cetre case goes.


string through the hole on the nose cone

Lance is coving with a nice pose. We are going to fill the gap underside between the centrecase and hull so the coving would be enough to be done reasonably.

The centre case and the gantry tubes on each side


We are aiming to the deck dryfitting this wednesday, few small jobs and the last laminating after turn over, covering the deck. We can see the sun light at the end of the tunnel.