2012년 6월 12일 화요일

2nd laminating

We did the 2nd laminating, two of us worked on making splashes.

Chris explained us about how the splashes stand up, centre board is pulled up, mast goes on top but actually I couldn't follow what it means exactly. We will see it anyway.

Andrew is drawing another line for the thickness of the mat on the plywood. I couldn't get the exact concept this morning. Maybe I wasn't awake.


Dryfitting


The splash goes on hull and support like this anyway.


Those tanning lines are rebates for the laps. Make sure not forget the little part each side of chine which can't be easily sanded. Tapu and I got a mission of that last laminating at nose tomorrow.


Andrew interpolated a line between two frames, which seemed to be pretty precise.


Drew two lines of frame, mark some points between those lines, use a batten and draw the line.

This material is the one that has to be done by vacuming. Nomex homeycomb.


Get ready to vacume.

We apparently put more glue this time so that those dots of resin stretches to where the hose vacuming is.

nomex & kevlar
duritec
hibuild
A/B/C/... class cat
buff up
genoa
gennaker
spinnaker
jib
amber



댓글 없음:

댓글 쓰기