2012년 3월 12일 월요일

Keep planking(12032012)


Having had only 5 attendance today, we kepts planking on and one team lofted the topside for cutting it using spiling plank.



We can hardly see the line for cutting through the plank longitudinally, which is for making sure that it can let the plank more twisted forward because of more shape on it, whereas not likely on the stern which we left the plank widely. The advantage of this method is we don't have to make narrower strips all the way long but it is a bit hard to glue between those gaps, we can use paper tape though.


Spiling planking is running the topside frames. Measure easy measurement like 100, 200 from both of the edges. Prior to doing this, make sure to draw a line following station line on the pattern. Such a method is the one that we adopted when we were making the topsides of Don's dory. Foam is going to be butt joint. If they get scarphed, they lose their advantage of flexibility but I'm concerned about the joint part has too much load or stress on it.


One planking being chipped off last week was cut out today by using jig saw and hand saw and we fille the gap with that small piece of planking. It doesn't look bad indeed, we know how such an accident can be fixed as well.



Taking the nail off, sanding it.


Attaching two planks for the pattern


lofting the topside


the pattern for topside(spiling planking)


fixing two patterns into one


dryfitting, we've got pretty far.


lofting


all planks fit in where they have to go before glueing. We've only left some gap just under the chine each side and topsides which Lance is working on. It takes longer than I thought but we can obviously finish it by tomorrow. The last planking was sort of tricky but not that hard. I measured the length of the gap on each frame, tranferred on to the planking, use a batten and drew a fair line but I have drawn straight line on each section and planing, fit it.


We used paper tape, two pieces of wood and a clamp but we still have some gap below that part.


View from station 0(F.P). We halve and halve half of the planking forward but we couldn't really fit those plankg onto the frame, which should have been.


grab those planks to make them flush


We haven't finished both sides. Only starboard side was done.


Cutting the foam rougly but quite exactly and get them butt joint. We are goint to cut them into finish size and put them on the frame. We can do it.


Tape is supposed to be used to prevent sanding excesss glue along the joint. Plastic for let cardboard and foam not stuck each other.


another view


There were three part longitudinally but the last one was not wide enough so it had another piece on.


2012년 3월 6일 화요일

Shaw 550 bevel board(07032012)

distance from F.P to the collision bulkhead: 600mm

8mm foam
floors(40*40) - 5 pieces needed
girder
nosecone
cockpit side
bulkhead
transom

15mm foam
the rest of them(roughly)
limit the fiberglass overlap section in minimum 40mm, maximum 50mm, use sandpaper stick on a pice of wood. sand the overlap part down for the depth(no less, no more) of the glass. Weight is our enemy(F.C). Cover 50mm on the deck edge through the hull to the other side of the deck edge.

carline line
the line between cabin top and deck

When making the pattern before cutting the foam for cabin top, mind the thickness of the foam goes on around the carline and bevel, make a bevel lofting for it which has to be expand depending on the shape of cabin top.

Scarphing part of each planking has to be kind of away from each other, otherwise the area of them together becomes too rigid so that the hull lose its flexibility, which can cause fatigue failure easier thatn it is more flexible. It has to have elasticity.


nosecone male(?) jig which didn't go well


and holes for it

final decision: glue and nail

actually
yellow 60
green 80
pink 100
blue 130
light brown 200


getting there

empty space has been filled up. Getting used to glue, but I still a bit more like an amateur. The process is slower than we thought initially, but our goal by tuesday next week is to finish the planking. Bow has way more shape than stern so the planking has to be tapered or cut through it half a bit in longitudinally with using bandsaw.


Figuring out how many and which sheets of foam there are, we estimated that we need 8 sheets of them, 8mm(green) and Chris said that it costs $1500 for one sheet. It is made by High Modulus and the name of it is AREX. The bigger the number it has, the denser it is. The number represents the weight per cubic metre but it is nominal because the material is not homogenous(pretty even though) and the thing is the number is for the material before the foam made into.

for making a pattern for forward deck, what does the numbers and words mean?


deep ripping new timbers(western red cedar) 6200*?*50


leave this gap in order to do the job for the fuller going under the deck as well as the prowtube. I hope we can do the job before this course finishes.


cockpit sole lofting(pattern), measure the distance from the edge of cockpit side and cockpit sole to centreline, use a batten, draw it but make sure the bevel.


Shaw 550 cockpit sole bevel board

planking(06032012)

We carried on planking.

The hull of this boat doesn't have an inflection point, so if there is we have to adjust it. Tapu looks like scraping excess glue off. We completed chines but one for portside has justified. The strips have to be laid as even as possible.


When after drawing a line underneath between two strips, use this straight edge for a clear line on.

We adjusted deck frame 7, because of the thickness of the bulkhead, 15mm. Bore a hole on some small peaces of MDF to make the gap(bulkhead) between frame 7 and the cabin hatch frame. The holes have to have enough space to control two frames on proper position.

befor adjustment

There is a crack made by one of our classmates but Chris said it is not really hard thing to adjust it. After planking, cut it out using router and put the other plankings. It will even be a good chance to fix the boat. It is hard to figure out the inflection point on frame 3 but there is, which has to be adjusted. When walking inside frames, we have to be aware of the lofting nails. They can hurt.

Lance made a jig for nose cone, getting the measurement on AutoCAD WS. The nose cone is slightly wider on the top of it than the bottom so the jig has a tiny bevel on those semicircles. It is going to be made with high density foam which is cut into several strips with filler. In order to minimise the amount of the filler, make them trapezoid.

We used paper tape to grab the strips not to let them go uneven and I thought that if I can use a cylinder on to them and tape around them together.

so far, so good.


looking good joints


Grab two strips on the chine where it was said to be justified.


dryfitting?

It is a temporary jig for making the scarph of planking in width direction. We had to make sure that the timber or whatever not to go beyond the centre of the disk or end up feed the material into the way the disk goes.


frame 0 which was kind of difficult to level it, because it is somewhat narrow.


It is set. To make the foam strips of nosecone trapezoid decline the table.

heaps


the concept of the nosecone jig


scarphing, ratio 1:7(roughly)


2012년 3월 4일 일요일

Adjustment(05032012)



a little lump in the middle


forward part seems little unfair because of the mistake on frame 0,1,2

take out, shift, adjust the frames

looks like a boat

deck frames and some loftings


the deck frame

hull frames and temporary spalls

a brace through a frame


neat

line up!

Andrew deep ripping


the first planking goes on to where it has to be


the first planking

our work so far



planking


feed in, tale out

what is that? maybe a big fire in that year

a black annual ring split the plankng into two

Chris reminded us last week, the concept and rough sequence of building this boat this morning. One other thing that he told us is that he recommend a free program naming gantter which is capable of making gant chart and he shared his file to some students having a laptop with them, talking about project management as well. The first mission today was the deep ripping. The timber that Lance and I skimmed last week was deep ripped and while one team was doing that the other team with Chris dressed those planking. Some of those planking has a splitable black annual ring which I reckon there was a big fire in that year, but I should have asked Christ anyway. We sat two plankings one of which is on the chine and the other one is sat in the middle of the chine and keel and it needs tiny bit tension up side to make the other plankings sit easily. When one of them sat properly, use bevel and sort out the angle between the first planking and it so that they have the same angle. We actually made a mistake on the frame 0,1,2 which have to be infront of the station line, but they weren't so we redo them. It wasn't a big deal that the first planking became a bit short.

tomorrow
scarphing
topside lofting

wednesday
planking finished

by next wednesday
glass inside the hull

A rib(sometimes there is a ring frame) is going through gunnel to gunnel whereas the floor goes on partly(partial stiffener).

collision bulkhead 8mm higher density
mast bulkhead 15mm
cockpit bulkhead 8mm light density

cockpit sole embracing the upper side of  the centre case is filled with rubber epoxy on the side of joing.